Case Studies · Education

Education

  • Industry: Education
  • Location: Louisiana
  • Stats: PRESSURE DROP: 58%, PROJECT SIZE: 44 AHUs
Education case study image

Equipment

Unit nameUnit sizePre-readPost-readReduction
NCF – AHU 121,762 CFM.46.1959%
ARENA – AHU 75,343 CFM.50.3334%

Assumptions

Electricity cost/kWh$0.08
Operating days/week7
Operating hours/day24

What was done

After performing coil cleaning and penetrating through the full depth of the coil:

  • Average pressure across all units dropped by 58%

Pressure drop

Pre-Read: NCF.46 In-Wg
Post-Read: NCF.19 In-Wg
Pre-Read: ARENA.50 In-Wg
Post-Read: ARENA.33 In-Wg

Annual savings

$74,083Total cost savings
$7,564Cooling savings
$66,519Fan savings
582 MTCO2 emissions removed