Equipment

Unit namePre-readPost-readVariance
FC 17Velocity25649292%
Temp7863-20%

Assumptions

Electricity cost/kWh$0.19
Operating days/week7
Operating hours/day24

What was done

After performing coil cleaning and penetrating through the full depth of the coil:

  • Sample unit FC 17: velocity 256 → 492 (92%)
  • Sample unit FC 17: temp 78 → 63 (-20%)

Sample unit readings

FC 17 velocity: pre-read256
FC 17 velocity: post-read492
FC 17 temp: pre-read78
FC 17 temp: post-read63

Total savings

$107,264Energy savings
All case studies