Case Study

HealthCare

UT Southwestern Medical Center

July. 2022
icons_site

PROJECT SITE

Zale Lipshy
5151 Harry Hines Blvd
Dallas, TX 75390

icons_units

UNITS SERVED

14

icons_pressure

AVERAGE PRESSURE DROP

47%

 Highlights

icons_pressure

Average Pressure Drop Across All Units

47%

icons_fan

Annual Fan Instant Savings

$33,043

icons-green_plus
icons_snowflake

Annual Cooling
Savings

$18,569

icons-green_equals
icons_money

Total Annual
Cost Savings

$51,612

icons_CO2

Annual Co2
Emissions Removed

231 TONS

 Details

Blue Box Air™ serviced the units at Pillar - Cognizant:

Units of Measure → Pre-Read and Post-Read measured in In-Wg, Unit Size is CFM

icons_pressure

AVERAGE PRESSURE DROP

47%

icons_assumptions

Assumptions

Electricity Cost: $0.100

Operating Days: 7

Operating Hours: 24