Case Study

Hospitality

The Ritz-Carlton - New Orleans, LA

August. 2023
icons_site

PROJECT SITE

Ritz - 921 Canal Street, NOLA
921 Canal Street
New Orleans, Louisiana 70112

icons_units

UNITS SERVED

18

icons_pressure

AVERAGE PRESSURE DROP

49%

 Highlights

icons_pressure

Average Pressure Drop Across All Units

49%

icons_fan

Annual Fan Instant Savings

$10,658

icons-green_plus
icons_snowflake

Annual Cooling
Savings

$53,638

icons-green_equals
icons_money

Total Annual
Cost Savings

$64,296

icons_CO2

Annual Co2
Emissions Removed

469 TONS

 Details

Blue Box Air™ serviced the units at The Ritz:

Units of Measure → Pre-Read and Post-Read measured in In-Wg, Unit Size is CFM

icons_pressure

AVERAGE PRESSURE DROP

49%

icons_assumptions

Assumptions

Electricity Cost: $0.100

Operating Days: 7

Operating Hours: 24

icons_photos

Project Photos